This provided some design challenges with single wall elevations at 5.5m. SIPCO commissioned comprehensive testing to ensure all design challenges were overcome before delivery.
Supplied and erected by SIPCO, a total of 3000sqm of panelling was used on the project, delivered on time, with 25 days spent on site.